Printable Wallpaper Glue Mixing Card: Ratio and Coverage

A printable field card for wallpaper glue powder: mixing ratio, rest time, coverage reference and a sample-test record. Use the exact product TDS for the final ratio.

Author: Published: Updated:

This page is a printable field card for wallpaper glue powder. It summarises the mixing reference, rest time, coverage reference and a short sample-test record. Use the exact ratio on the product label or technical data sheet (TDS) for the final instruction; this card is a field aid, not a substitute for the TDS.

1. Mixing ratio reference

  • Common reference ratios: 1:25 or 1:30 powder to water, depending on the model and TDS.
  • Add powder to water while stirring, not water to powder, to reduce lumps.
  • Stir until evenly dispersed, then let the mix rest for the time stated in the TDS before use.

Different models and markets may require a different ratio. Confirm the ratio for the exact model before mixing a full batch.

2. Viscosity reference

Published reference viscosity for Hangzhou KARN models is measured with a 5% solution, NDJ-8 (K6/999/999+) or NDJ-8S (KN-999), No. 4 rotor, 6 rpm:

  • K6 Ordinary Grade: 38,000 ±10% mPa·s
  • 999 Universal Grade: 60,000 ±10% mPa·s
  • 999+ Anti-mold Grade: approx. 60,000 ±10% mPa·s
  • KN-999: measured 40,141 mPa·s, DS 0.3-0.4

Do not compare viscosity numbers measured at different concentration, instrument, rotor or speed.

3. Coverage reference

200 g of powder is often quoted as approximately 25-30 m² of wallcovering. Treat that as a reference figure, not a guarantee: actual coverage depends on substrate porosity, wallcovering weight, application thickness and waste. Record the actual coverage from a sample area before estimating a project quantity.

4. Field record (print and fill)

ItemRecord
Product model____________
Batch / COA number____________
Powder weight / water volume____________
Water temperature____________
Rest time before use____________
Open time observed____________
Sample area and result____________
Installer / date____________

5. Common field mistakes

  • Adding water to powder, creating lumps.
  • Skipping the rest time, reducing initial tack.
  • Reusing a mix beyond the stated working time.
  • Estimating coverage from another model or another substrate.

6. Documents to keep

Keep the TDS version, batch COA, and the filled field record with the project file. For a repeat order, compare the new batch against the retained sample and the original record.

Related resources